AYN
AYN Thor Lite, Base, Pro & MAX
In Stock
£424.74 - £716.34
12 people are viewing this right now
£475.14inc. VAT
Less than 10 items left!
OLED Display
1080P
4K @ 60Hz
120Hz Display
LPDDR5X
UFS 3.1
8000 mAh Battery
Wi-Fi 7
Bluetooth 5.4
AndroidWelcome to the next evolution in handheld gaming with the AYN Odin 3 – a device that redefines portable gaming with cutting-edge technology, sleek design, and unparalleled performance. Merging the best of modern advancements with an ergonomic and stylish form factor, the Odin 3 is engineered to deliver a seamless gaming experience whether at home or on the go.


The AYN Odin 3 pushes the boundaries of handheld gaming with its 6-inch 120Hz AMOLED display, offering breathtaking visuals with a modern design for a fully immersive experience. The Odin 3 provides a premium aesthetic with a smooth, responsive touchscreen, setting a new standard for gaming handhelds.

More than just a gaming console, the AYN Odin 3 is designed to handle both entertainment and demanding tasks. The 8 EliteProcess CPU, combined with the powerful Adreno 830 GPU, ensures smooth gameplay and stunning graphics. With Wi-Fi 7 and Bluetooth 5.4, you get next-gen, ultra-fast connectivity for online gaming and streaming, making this handheld a perfect companion for any setting.
Performance At the heart of the Odin 3 lies the 8 EliteProcess chipset, built on a 3nm process. This powerhouse features Oryon cores clocked at up to 4.32GHz, ensuring fluid multitasking, rapid load times, and exceptional gaming performance. The Adreno 830 GPU complements the system, delivering console-quality graphics with smooth frame rates, even in the most demanding titles. The active cooling system ensures sustained peak performance.
Memory and Storage Offering a comprehensive range of configurations, the Odin 3 is available with ultra-fast LPDDR5x RAM at 5300MHz:
Storage utilizes the high-speed UFS 3.1 standard:
These high-speed memory options allow for rapid data processing and seamless gameplay.
Running on Android 15, the Odin 3 provides access to thousands of games, apps, and emulators. Its massive 8000mAh battery, paired with 60W fast charging, ensures extended play sessions without long downtimes. The USB 3.1 Type-C port supports DisplayPort Alt Mode, allowing for 4K @ 60Hz video output to an external screen.
A Pioneer in Retro Gaming and Beyond The AYN Odin 3 excels at retro and modern gaming alike. Whether you're emulating classic consoles or playing the latest Android games, this device delivers an exceptional experience. With its ergonomic design and a compact form factor of just ~390g, it provides an intuitive and comfortable experience for extended gaming sessions.
Be Part of the Gaming Revolution The AYN Odin 3 is more than just a gaming device – it's a revolution in portable entertainment. Whether you're an Android gamer, a retro gaming enthusiast, or a streaming aficionado, this handheld is built to elevate your experience. Don't miss out!

SKU: AYN-ODIN-3-BASE-BLACK-8GB-128GBCategories: Retro Game Console, Gaming Handheld, Android Gaming Handheld, Retro Handheld Game Console, Handheld Retro Consoles
Every configuration is listed. Choose your options to see the specifications of one.
Reviews, guides and news about the AYN Odin 3 Base, Pro, Max & ULTRA from the DROIX Blog.
All 6 articlesStep-by-step guides for the AYN Odin 3 Base, Pro, Max & ULTRA from the DROIX Knowledge Base.
All 5 guidesNo downloads for the AYN Odin 3 Base, Pro, Max & ULTRA yet.
Resource librarySpread the cost of your £475.14 order interest-free or over longer terms. Choose a provider at checkout — checking your options won’t affect your credit score.
3 payments of £158.38
0% interest · one third today, then every 30 days
4 payments of £118.79
0% interest · spread over 6 weeks, paid fortnightly
Spread the cost over 3 to 48 months
Eligibility and terms are confirmed at checkout
Flexible financing available
Eligibility and terms are confirmed at checkout
Spread the cost over 6 to 12 months
Eligibility and terms are confirmed at checkout
Pay directly from your bank account
Eligibility and terms are confirmed at checkout
18+, T&Cs apply. Credit subject to status & affordability checks. DROIX Ltd acts as a credit broker, not a lender, and offers finance from a panel of lenders. Choose your provider at checkout.
AYN
In Stock
£424.74 - £716.34
RETROID
In Stock
£331.14 - £369.54
RETROID
In Stock
£327.54 - £364.74
KONKR
In Stock
£413.94 - £836.34